Devices of this series are used to meter consumed electricity. Currently, the TsE 6807 meter is not produced. Instead, manufacturers offer modern models with improved consumer characteristics. However, the information below will be useful for solving practical problems during operation.
The compact energy meter TsE6807p has good consumer characteristics
Description of the counter
This device performs its main functions using a shunt. High accuracy is ensured by calibration of the corresponding electrical resistance (up to hundredths of an Ohm). The voltage is constantly monitored using an inductive sensor. Using an electronic board, the received data is processed and time intervals are taken into account. The amount of energy consumed (formula E=U*I*t) is displayed using mechanical (electronic) indicators.
Electric meter device
For your information. In the model shown in the photo, the components of the mechanical indicator are rotated by a stepper motor.
The signals to control the drive are generated by the controller. At the same time, pulses are sent to the verification LED. According to the standard control procedure during testing, the number of flashes over a standardized time interval is counted. In some modifications, optical isolation is installed to transmit readings to a remote telemetry system. To maintain a certain frequency (accurate fixation of time intervals), a standard quartz stabilizer circuit is used.
How does an electric meter work?
The device of a single-phase direct-connection electric meter, Energomer, will now be clearly visible in the photographs. Let me remind you that his appearance is in the first photo of the article.
I got a working meter, they gave it to me because where it stood, the owner of the premises changed, and the new owner was obliged to change the meter.
There are usually 2 seals on the meter, one protects the meter terminals from unauthorized access, the second protects the electronic circuit of the meter. These seals are no longer on my meter.
Remove the cover and see the terminals
Let's take a closer look at the terminals.
Electric meter terminals
The terminals are clamping and hold the stripped wire well along its entire length.
Now the most interesting thing is to open the meter housing:
Energy meter tse6807p. Front panel removed
Energy meter counter. Removed cover, photo 2
We take out the guts and see that the electric meter circuit consists of three main parts:
We take out the insides of the Energomer TsE6807p electric meter
This is 1) a stepper motor with numbers attached to its axis, 2) a board with a controller and 3) input terminals. As you can see, everything is Chinese (I hope, except for the terminals), which is why the price of such a meter is 650-750 rubles.
By the way, I haven’t seen it, but in Mercury the production of components is Russian. Who will confirm?
Terminals and board with controller. Everything is upside down, so the phase terminals of the meter are on the right, zero terminals are on the left, not as we are used to seeing.
The white and green wires are the output of the measuring shunt. The same shunt on which the voltage, proportional to the current through the phase terminals, “settles”. This voltage is supplied to the inputs of the board KT1 and KT2 and is supplied to the controller for processing.
Also, power for the controller is taken from the phase terminal; this is the yellow wire. Power supply is transformerless, through a capacitor, rectifier and 5VDC stabilizer.
The zero terminal is used to take the second pole to power the meter. And also in order to ensure connection, and to limit malicious schemes for turning on the meter.
From the output of the controller board through points M1.1 and M1.2, pulses are sent to the stepper motor. The one that is braked using a magnet. The pulse frequency is proportional to the current, and is additionally indicated by an LED.
I talk about the stepper motor on my blog in an article about repairing a machine using a controller.
This LED is used to check and verify the meter. Count the number of pulses in (for example) 5 minutes, and look at the correctness of the readings on the front panel.
The controller contains a program that generates pulses for the operation of the stepper motor.
By the way, the program can be changed, craftsmen do it. This way you can reduce the meter readings by 30 - 50%.
Here is a slightly larger photo of the meter printed circuit board:
Terminals and board with controller. More photos
Structure of the symbol: TsE6807P X1 X2 X3-X4 X5 X6 X7
How to install an electric meter yourself
The full name of the device according to the established standard encodes the following characteristics:
- X1 – measurement accuracy class, which for these meters should be no worse than 2nd;
- X2 – rated voltage (220V);
- Х3-Х4 – current values (nominal and maximum);
- X5 – electronic (E) or mechanical (M) method of displaying information, the number indicates the number of digits;
- X6 – type of housing, taking into account the location of the equipment;
- X7 – operating temperature range.
The following is indicated separately in the passport, on the case and in the accompanying documentation:
- year of issue;
- product serial number.
Purpose of the device
The Energomer TsE6803 V counter allows you to measure the active component of consumed power. The device was included in the register of measuring instruments and can keep records at one tariff.
This fact suggests that it cannot be used to separately calculate energy during the day and at night in accordance with the tariffs of the organization supplying electricity.
The device can be connected using three or four conductors. In the second case, not only phase conductors are used, but also the neutral wire. Direct or indirect (using transformers) connection to a 50 Hz network is also possible. The device can be installed outdoors, but only in cabinets that prevent dust or moisture from getting inside the meter.
When installing the device, the following requirements must be observed:
- The operating temperature range should be from -40 to 60 degrees.
- Air humidity cannot be higher than 98%.
Subject to all operating conditions and proper connection to the electrical network, the service life of the device is 30 years. The manufacturer provides a four-year warranty on its product from the moment the meter is put into operation.
Specifications
How to seal an electricity meter
The TsE 6807 meter was produced in different modifications, so to clarify the data, appropriate corrections should be made. The following are typical characteristics of popular series:
- housing options for installation: P5-rail, Ш6-shield;
- accuracy class – 1 or 2;
- rated voltage – single-phase, 220V;
- current (nominal/maximum) – 5/60 A;
- operating temperature range – from -40°C to +60°C or from -30°C to +60°C;
- electricity consumption under normal conditions – no more than 0.6 W/hour;
- number of pulses per 1 kW (for transmission to an external control device) – 3.2 thousand;
- time to switch to operating mode after connection – no more than 5 seconds;
- The minimum current for the operation of the device is 0.01 A.
Device for reading and programming electricity meters Energomera [USP6800]
Add products to your favorites, save your cart, receive personal discounts and price reduction notifications!
TU 4229-018-04697185-97 Device for reading accounting information about consumed electricity through the optical port of multifunctional electricity meters with subsequent transmission to a computer. — Memory storage capacity: 850 kbytes; — Correction of clock rates and electric meter constants; — Powered from an internal source.
- Description
- Characteristics
- Shipping and payment
The installations are designed for testing and adjusting induction and electronic single-phase and three-phase Energomer meters, wattmeters, varmeters, power converters in the industrial frequency range.
Indicators | Quantities |
Data memory capacity for storing read information, bytes | 850000 |
Powered by 4 batteries (size AA, 1.5V), V | 6 |
Current consumption, no more, mA | 100 |
Clock stability at normal temperature, s/day | ±1,5 |
Additional clock error within the operating temperature range, no more, s/day | ±0,2 |
Operating temperature range, °C | from -10 to 55 |
Overall dimensions, mm | 110 x 230 x 60 |
Weight, no more, kg | 1,0 |
Average service life, not less, years | 10 |
The SimpleTech online store offers the Energomera USP6800 device for reading and programming electricity meters with delivery throughout Russia.
Delivery in Moscow and the Moscow region
Carried out by our courier service on weekdays from 11 a.m. to 6 p.m. The delivery date and time are agreed with you in advance. The driver does not lift the goods to the floor, and also does not check the equipment.
Cost of delivery
— 600 rubles within the Moscow Ring Road + 20 rubles / kilometer outside the Moscow Ring Road.
— FREE for order amounts over 70 thousand rubles + 20 rubles / kilometer for the Moscow Ring Road.
— Please check with our sales managers for delivery conditions for large cargo.
Delivery to regions
Delivery of orders for the Energomera USP6800 Electricity Meter Reading and Programming Device to other cities in Russia is carried out by transport companies that have a cargo collection point in Moscow. We DO NOT deliver goods to Turkmenistan, Kazakhstan, Georgia, Kyrgyzstan and other CIS countries. Delivery costs are calculated according to the tariffs of transport companies.
Payment by bank transfer
Payment for goods by NON-CASH payment in our online store is made by 100% advance payment .
For detailed terms of delivery and payment, read the relevant sections in the header of the site.
Connecting the meter
Measuring instruments of this category are installed in series with electricity consumers. Typical algorithm of actions:
- after removal from the factory packaging, check the integrity of the case and installed seals;
- the connection is made according to the diagram from the official instructions (conductor cores - from 1 to 6 mm);
- to connect telemetry equipment, take into account the nominal/maximum parameters of current (10/30 mA) and voltage (12/24V);
- the transition to the operating mode is accompanied by a change in data on the digital display (LED blinking).
For your information. The initial readings are the result of factory verification.
To preserve the planned resource, favorable regimes should be provided:
- transportation – temperature from -40°C to +70°C, relative humidity – no more than 98% at +35°C;
- storage – in a heated room (from +5°C to +40°C), relative humidity – no more than 80% at +25°C.
Instructions for the Energomer counter
Below are instructions for the Energomer TsE6807 , which is discussed in the article. All parameters, connection diagram, as well as the device and operating principle of the meter according to the manufacturer's version are given there.
Energy meter instruction 1
Energy meter instructions 2
Energy meter form 1
Energy meter form 2
There was also a piece of paper so that the testimony could be written correctly:
Meter reading numbers
According to the rules, the figure indicating fractions of a kilowatt hour must be highlighted graphically. This is what is being done, see the photo of the meter in the housing.
Documentation and passport
Official information about products can be obtained on the manufacturers' websites. The standard set of accompanying documentation contains the following information:
- name, address, contact details of the manufacturer;
- model identification data;
- links to industry (state) standards;
- drawing with general view and dimensions;
- safety regulations;
- general description of the product (operating principles);
- specifications;
- installation work;
- operating features;
- information about verification, maintenance, storage, transportation.
Energy Saving Tips
To distort the measurement results downward, use:
- installation of bypass circuits;
- design changes;
- strong permanent magnets.
These and other illegal actions are detected during regular and prompt inspections. Violators are punished with large fines and disconnected from power supply networks. To avoid such troubles, it is recommended to use the permitted methods of saving:
- replacing outdated incandescent lamps with LEDs;
- energy efficient heating and air conditioning systems;
- modern technology with high efficiency parameters.
Good results can be achieved through comprehensive measures. In addition to the appropriate equipment, the “multi-tariff” connection should be used correctly. The operation of individual consumers is configured for temporary periods (night, weekends) with a minimum cost of electricity. Unfortunately, the TsE6807bk meter is not suitable for implementing such projects.